1179/2774 75-02
| Fichier | A075E2249.jpg |
| Date | 23/05/2014 |
| Description | Paris 17: AmÈnagement de la ZAC Clichy Batignolles entre la gare Cardinet et le boulevard Berthier / Immeubles en construction avenue de Clichy *** Local Caption *** Paris 17: The area Clichy BatignolThes between the railway station Cardinet and bouThevard Berthier under construction |
| Folio | 75-02 |
| Auteur | Ph.Guignard/air-images.net |
| Pixels | 4000 x 2667 |
| Jpeg | 3 091 Ko |
| Image | 31 254 Ko |
| Cm/300 dpi | 33.87 x 22.58 cm |